Preparation controls the result
Grease removal, labeling, filling, sanding, caulking, and adhesion primer often consume more labor than the finish coats.
Price doors, drawers, cabinet boxes, preparation, materials, overhead, and profit without forcing cabinet work into a wall-painting formula.
Calculate cabinet bidCabinet painting labor calculator
Cabinet refinishing is detail-heavy. This estimator prices the major components separately.
Recommended cabinet bid
Doors0 hrs
Drawers0 hrs
Boxes, setup, and closeout0 hrs
Labor cost$0
Inspect coating condition, wood species, layout, hardware, and customer finish expectations before final pricing.
Cabinet estimating guide
Grease removal, labeling, filling, sanding, caulking, and adhesion primer often consume more labor than the finish coats.
Doors and drawer fronts are only part of the scope. Include boxes, end panels, toe kicks, crown, islands, shelving, and both sides when required.
Removal, transport, rack space, masking, drying time, and reinstalling hardware can limit daily output even when spraying is fast.
Clarify grain visibility, sheen, color changes, interior surfaces, repairs, and acceptable imperfections before agreeing on price.
Cabinet bid notes
Cabinet jobs are controlled by the number of doors, drawer fronts, box openings, end panels, shelves, and detailed profiles. A small kitchen with ornate doors can take longer than a larger room with flat surfaces, so the calculator prices components instead of square footage alone.
Cleaning grease, labeling parts, sanding, caulking seams, filling dents, priming, and waiting for proper cure time often take more labor than the final coat. If existing coating condition is unknown, add time for adhesion testing and a small repair allowance before quoting.
Removal, transport, rack setup, drying space, reinstalling hardware, and touchups create labor that customers rarely see. Include shop time or site setup time so the proposal does not depend on perfect conditions.
Agree on sheen, color change, grain visibility, inside surfaces, hardware replacement, and acceptable imperfections. A clear finish expectation reduces disputes and makes the calculator result easier to turn into a written scope.
Sizing the job
Cabinet labor scales with component count and finish expectations, not square footage. Start by counting doors, drawer fronts, visible box openings, side panels, islands, crown, toe kicks, and any glass or detailed profiles — then add time for labeling, removal, cleaning, sanding, masking, priming, coating, drying, reinstalling, and touch-ups. A simple job with flat doors and light prep moves quickly; a similar-size kitchen with grease buildup, damaged edges, or a dark-to-light color change can take much longer even though the door count is identical.
| Kitchen size | Typical component count | Labor range |
|---|---|---|
| Small | ~12 doors, 5 drawer fronts, 6 box sections | 22–32 hours (simple finish, light prep) |
| Medium | ~24 doors, 10 drawer fronts, 12 box sections | 45–60 hours (removal through reinstall) |
| Large / detailed | Raised panels, glass doors, islands, crown | 80+ hours (heavy grease, coating failure, dark-to-light change) |
These ranges assume the estimator counts parts and adds separate time for setup, handling, drying space, and final adjustment — cabinet labor should never be treated as a wall-painting square-foot problem. Labor increases further when cabinets need heavy degreasing, old coating removal, grain filling, repairs, caulking, masking, hardware replacement, color changes, or a high-smoothness finish expectation. Removing doors, labeling parts, transporting them, setting up racks, waiting for dry time, flipping parts, and reinstalling hardware all create real labor even when spray time itself is short — and coating, sandpaper, masking materials, cleaner, caulk, filler, strainers, tips, and protective supplies should be priced outside the labor calculation entirely, in the material allowance field above.
Worked example
This sample kitchen includes 24 doors, 10 drawer fronts, 12 cabinet box sections, one island end panel, standard degreasing, sanding, adhesion primer, and two finish coats — a color change from stained wood to a painted satin finish. Cabinet interiors, new hinges, and hardware replacement are excluded from the base estimate.
| Component | Quantity | Estimating note |
|---|---|---|
| Doors | 24 | Remove, label, clean, sand, prime, finish both sides, reinstall |
| Drawer fronts | 10 | Remove hardware, prep face and edges, finish exposed surfaces |
| Cabinet boxes | 12 sections | Mask kitchen, prep frames, finish face frames and exposed panels |
| Island/end panels | 1 allowance | Included inside box labor allowance |
| Prep level | Standard/heavy | Degreasing and adhesion prep required for stained cabinets |
Doors average about 0.65 labor hours each once removal, cleaning, sanding, priming, coating, drying management, and reinstalling are counted — 15.6 hours for 24 doors. Drawer fronts average about 0.45 hours each (4.5 hours for 10). Cabinet boxes run heavier at about 1.15 hours per section because masking, working in place, edges, and customer protection slow the work — 13.8 hours for 12 sections. Add 8 hours for setup, labeling, shop/rack preparation, transport, final walkthrough, and touch-ups, and the base labor estimate is 41.9 hours. Because this job is a stain-to-paint conversion, a 20 percent risk factor is added for adhesion testing, extra sanding, and detail work, bringing final estimated labor to about 50 hours.
At a $48 loaded hourly labor cost, 50 hours is $2,400 in labor. Add a $700 material allowance (primer, finish coating, abrasives, masking, caulk, filler, tack cloths, cleanup supplies) and $400 for shop, delivery, and setup, and direct job cost is $3,500.
| Line item | Amount |
|---|---|
| Labor cost | $2,400 |
| Material allowance | $700 |
| Shop, delivery, setup | $400 |
| Direct job cost | $3,500 |
| Overhead at 15% | $525 |
| Cost before profit | $4,025 |
| Suggested selling price at 25% margin | $5,367 |
The customer-facing proposal should state whether interiors, shelves, underside panels, crown, toe kicks, glass doors, hardware, soft-close hinges, and repairs are included or excluded, name the coating system, and note that existing wood grain, old damage, seams, or prior finish defects may remain visible depending on the selected finish standard. Doors and drawer fronts finished off-site need drying and curing time that can limit daily progress even when spraying itself is fast — reinstalling too early can damage the finish, so separate working days from cure time in the schedule you promise the customer.
FAQ
Linear-foot pricing can be a quick screen, but labor is driven by parts, profiles, condition, handling, and finish expectations. Two kitchens with the same length can require very different labor.
Only include hardware if the scope says so. Reusing existing hardware, drilling for new pulls, replacing hinges, or adjusting doors can each change labor and material cost.
Adhesion and contamination. Grease, silicone, furniture polish, old coatings, and unknown clear coats can create finish failures if prep is underestimated — which is exactly why the risk factor exists in the worked example above.
Setup, masking, and access time get spread across fewer doors. A 6-door powder room vanity job still needs full setup, drying space, and cleanup, so the per-door cost is naturally higher than on a 24-door kitchen where those fixed costs are amortized.